Abandoned Mine Waste Repositories

Abandoned Mine Waste Repositories

Site Selection, Design, and Cost

Website or Online Data - 2003
Rate this:
The Bureau of Land Management (BLM) is conducting priority cleanups of abandoned mine sites on public lands. Typically, these sites contain tailings piles, cyanide heaps, and rock dumps that historically were constructed in or near drainages and now are releasing pollutants into watersheds. In compliance with regulations, BLM selects the most environmentally suitable site for removing mining waste and placing it into repositories. Repositories have different design features, and the design selected should be based on site-specific conditions and the results of water balance models. A Geographic Information System (GIS) can be a useful tool for screening and selecting a repository site. Industry sources and construction data from existing repositories can be used to predict construction costs. BLM found that the key factor in predicting cost is the volume of wastes to be placed.
Publisher: [Denver, CO] : U.S. Bureau of Land Management, National Science and Technology Center, [2003]
Branch Call Number: QL84.2 .L35 no.410
Characteristics: 1 online resource (iii, 8 p.) : digital, PDF file.

Opinion

From the critics


Community Activity

Comment

Add a Comment

There are no comments for this title yet.

Age

Add Age Suitability

There are no ages for this title yet.

Summary

Add a Summary

There are no summaries for this title yet.

Notices

Add Notices

There are no notices for this title yet.

Quotes

Add a Quote

There are no quotes for this title yet.

Explore Further

Browse by Call Number

Recommendations

Subject Headings

  Loading...

Find it at SDPL

  Loading...
[]
[]
To Top